Show simple item record

dc.contributor.authorWahyuni, Dini
dc.contributor.authorBudiman, Irwan
dc.contributor.authorSembiring, Meilita Tryana
dc.contributor.authorPanjaitan, Nismah
dc.date.accessioned2022-12-09T07:58:47Z
dc.date.available2022-12-09T07:58:47Z
dc.date.issued2019
dc.identifier.otherAkhmad Danil
dc.identifier.urihttps://dupakdosen.usu.ac.id/handle/123456789/5458
dc.descriptionNismah Panjaitanen_US
dc.description.abstractThis research was conducted in two brick SME s whose production processes include mixing, printing, drying and burning. In both SME s, there are idle workers indicating an unbalanced workload. Worker activity observation was done by work sampling method and obtained various productive time, that is 85-96% in first SME and 61-93% in second SME . The calculation of workload indicates an excessive workload on the drying station workers in the first SME also on the printing station workers and drying in the second SME . The calculation of the number of workers shows the number of existing workers can be maintained but it needs to be done to improve the allocation of tasks so that the worker's workload more evenly. The results of research if implemented are expected to increase worker motivation so that SME s can be more productive and competitive.en_US
dc.language.isoenen_US
dc.publisherUniversitas Sumatera Utaraen_US
dc.titleAnalysis of Workload and Number of Workers in Brick SMEsen_US
dc.typeProceedingen_US


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record